Civil Engineering

Woodsetts SPS

Client: Severn Trent

Principle Contractor: GEDA Construction

Woodsetts SPS involves the installation of a 7m diameter Pumping Station x 7m deep via installation of a Cofferdam and Pumping Station Segments were built using Cassion Rings, during Cofferdam installation we were also required to break out rock encountered. Works also involved new inlet, bypass and storm overflow pipework and chambers, installation of new MCC Kiosk, install of Chemical Dosing Plinths, install of valve plinths, new hard standings, new access roads, new kerbing and decommissioning of the existing STW.

Ashes Park PS

Client: Severn Trent

Principle Contractor: GEDA Construction

Ashes Park SPS involves the installation of a 7m diameter Pumping Station x 7m deep via installation of a Cofferdam and Pumping Station Segments were built using Cassion Rings, Works also involved new inlet, bypass and storm overflow pipework and chambers, installation of new MCC Kiosk, install of Chemical Dosing Plinths, install of valve plinths, new hard standings, new access roads, new kerbing and installation of new fencing and gates.

Upton STW

Client: Severn Trent

Principle Contractor: GEDA Construction

SFMCE were contracted to complete all site engineering plant and labour works at Upton WwTW including installation of all new Reinforced Concrete structures for upgrade of the existing Treatment process. The works included the installation of Cofferdam, Supply and install of Formwork, upgrade of new and existing process pipework, installation of new ducting, install of new hard standing’s and access roads.

Specific structures installed include;

New Inlet works

New Humas Settlement Tank 8.8m diameter

New Primary Settlement Tank 8.6m diameter

New Storm Tank 11m x 6m

New Storm Return Pumping Station 3m Dia x 5m Deep

New Humus Tank Feed PS 3m Dia x 4m Deep

New FE Stack 2.1m Diameter x 5m high above ground

Upton SPS

Client: Severn Trent

Principle Contractor: GEDA Construction

Upgrade of Upton SPS was completed to reduce flooding in the Upton area, it involved the installation of a 6m diameter by 7m deep Pumping Station, despite works initially being designed for a top down shaft installation, SFMCE proposed the installation of a cofferdam and building the Pumping Station from the bottom up. Ground Conditions proved difficult but local dewatering sumps were installed for groundwater until the Pumping Station was built. Works also included the installation of Valve Chambers, ducting, access roads, fencing, kerbing and Reinforced Concrete MCC Bases.

Long Itchington

Client: Severn Trent

Principle Contractor: GEDA Construction

Works at Long Itchington involved an upgrade of the below ground gravity drainage system to cater for increased capacity in the area. The scheme specifically involved the full supply and installation of wayleave fencing, supply and installation of 460m of 225mm gravity main approx. 2.5m deep including 1 number directionally drilled shot of 80m, supply and install of 8 number 1200mm diameter manholes approx. 2.5m deep. Traffic Management and Road Reinstatement as most of the works were carried out in the public Roadway. All Commissioning was also carried out by SFMCE

Holywood Sewers Network

Client: NI Water

Principle Contractor: GEDA Construction

Install underground pipes and pumping equipment

“Firstly I would like give a special word of thanks to Sean and Mick Flangan and there gang of hard workers, Sean worked many days and nights to achieve the key milestones crossing under many services…….known and unknown, they went over and above what would be expected to work hours wise to meet the criteria set out by Transport NI for working outside of “peak flows” of traffic. This involved a lot of coordination with Geda, Sean, HMM (Traffic management) and John McQuillan (surfacing squad) to achieve the key milestones – so thanks to them also. The slip road into Holyood has also been completed within the dates given to Transport NI.”

Paul,

Yes, huge thanks to you and the whole team for delivering this piece of work on time, with no overruns into peak traffic hours and with virtually no complaints.

The efforts everyone involved, including McAdam’s supervision team, went to deliver this crossing so seamlessly on one of NI’s busiest and most traffic sensitive roads really is very much appreciated.

Thanks again and please pass on our thanks to everyone who worked so hard to achieve this!

Liverpool Water Treatment

Client: Quinn Contracts

Installation of Segmental Shaft and Cofferdam

Honor Oak

Client: Dragtone

Installation of underground pipelines/inline valve replacement

ESB Pylon Installation

Client: RD Construction

Installation of New Overhead Pylons

Isle of Man Segmental Shaft

Client: Manx utilities/Island Drainage and Groundworks LTD

Construction of 12.5 x 7m Segmental Shaft and Cofferdam

Ballyclare WWTW

Client: GEDA Construction

Construction of 7m x 6m Segmental Shaft and Cofferdam

River Derwent Upgrade

Client: Duo PLC

Installation of 700mm steel welded pipeline and all associated valve arrangements