Civil Engineering
Woodsetts SPS
Client: Severn Trent
Principle Contractor: GEDA Construction
Woodsetts SPS involves the installation of a 7m diameter Pumping Station x 7m deep via installation of a Cofferdam and Pumping Station Segments were built using Cassion Rings, during Cofferdam installation we were also required to break out rock encountered. Works also involved new inlet, bypass and storm overflow pipework and chambers, installation of new MCC Kiosk, install of Chemical Dosing Plinths, install of valve plinths, new hard standings, new access roads, new kerbing and decommissioning of the existing STW.
Ashes Park PS
Client: Severn Trent
Principle Contractor: GEDA Construction
Ashes Park SPS involves the installation of a 7m diameter Pumping Station x 7m deep via installation of a Cofferdam and Pumping Station Segments were built using Cassion Rings, Works also involved new inlet, bypass and storm overflow pipework and chambers, installation of new MCC Kiosk, install of Chemical Dosing Plinths, install of valve plinths, new hard standings, new access roads, new kerbing and installation of new fencing and gates.
Upton STW
Client: Severn Trent
Principle Contractor: GEDA Construction
SFMCE were contracted to complete all site engineering plant and labour works at Upton WwTW including installation of all new Reinforced Concrete structures for upgrade of the existing Treatment process. The works included the installation of Cofferdam, Supply and install of Formwork, upgrade of new and existing process pipework, installation of new ducting, install of new hard standing’s and access roads.
Specific structures installed include;
New Inlet works
New Humas Settlement Tank 8.8m diameter
New Primary Settlement Tank 8.6m diameter
New Storm Tank 11m x 6m
New Storm Return Pumping Station 3m Dia x 5m Deep
New Humus Tank Feed PS 3m Dia x 4m Deep
New FE Stack 2.1m Diameter x 5m high above ground
Upton SPS
Client: Severn Trent
Principle Contractor: GEDA Construction
Upgrade of Upton SPS was completed to reduce flooding in the Upton area, it involved the installation of a 6m diameter by 7m deep Pumping Station, despite works initially being designed for a top down shaft installation, SFMCE proposed the installation of a cofferdam and building the Pumping Station from the bottom up. Ground Conditions proved difficult but local dewatering sumps were installed for groundwater until the Pumping Station was built. Works also included the installation of Valve Chambers, ducting, access roads, fencing, kerbing and Reinforced Concrete MCC Bases.
Long Itchington
Client: Severn Trent
Principle Contractor: GEDA Construction
Works at Long Itchington involved an upgrade of the below ground gravity drainage system to cater for increased capacity in the area. The scheme specifically involved the full supply and installation of wayleave fencing, supply and installation of 460m of 225mm gravity main approx. 2.5m deep including 1 number directionally drilled shot of 80m, supply and install of 8 number 1200mm diameter manholes approx. 2.5m deep. Traffic Management and Road Reinstatement as most of the works were carried out in the public Roadway. All Commissioning was also carried out by SFMCE
Holywood Sewers Network
Client: NI Water
Principle Contractor: GEDA Construction
Install underground pipes and pumping equipment
Liverpool Water Treatment
Client: Quinn Contracts
Installation of Segmental Shaft and Cofferdam
Honor Oak
Client: Dragtone
Installation of underground pipelines/inline valve replacement
ESB Pylon Installation
Client: RD Construction
Installation of New Overhead Pylons
Isle of Man Segmental Shaft
Client: Manx utilities/Island Drainage and Groundworks LTD
Construction of 12.5 x 7m Segmental Shaft and Cofferdam
Ballyclare WWTW
Client: GEDA Construction
Construction of 7m x 6m Segmental Shaft and Cofferdam
River Derwent Upgrade
Client: Duo PLC
Installation of 700mm steel welded pipeline and all associated valve arrangements